Replace poles with poles of a greater strength in existing Rayle EMC right-of-way, perform vegetation management by trimming and mulching right-of-…
Office of NEPA Policy and Compliance
March 24, 2025Replace poles with poles of a greater strength in existing Rayle EMC right-of-way, perform vegetation management by trimming and mulching right-of-way to Rayle EMC specifications, and convert existing overhead distribution line to underground in existing Rayle EMC right-of-way.