CX-033411: Resilient Rayle

Replace poles with poles of a greater strength in existing Rayle EMC right-of-way, perform vegetation management by trimming and mulching right-of-…

Office of NEPA Policy and Compliance

March 25, 2025
minute read time

Replace poles with poles of a greater strength in existing Rayle EMC right-of-way, perform vegetation management by trimming and mulching right-of-way to Rayle EMC specifications, and convert existing overhead distribution line to underground in existing Rayle EMC right-of-way.