CX-030826: La Pine Substation Shunt Capacitor Expansion

Bonneville Power Administration (BPA) proposes to perform geotechnical testing, soil resistivity testing and water infiltration tests at the La Pin…

Office of NEPA Policy and Compliance

May 21, 2024
Estimated Read Time   min

Bonneville Power Administration (BPA) proposes to perform geotechnical testing, soil resistivity testing and water infiltration tests at the La Pine Substation near La Pine, Oregon.