CX-024978: Industrial Carbon Capture from a Cement Facility Using the Cryocap FG Process

The objective of the project is to complete a front-end engineering and design (FEED) study for a commercial-scale, carbon capture system at cement…

Office of NEPA Policy and Compliance

November 4, 2021
Estimated Read Time   min

The objective of the project is to complete a front-end engineering and design (FEED) study for a commercial-scale, carbon capture system at cement manufacturing facility.