Proposed activity is to dig 12 inches deep by approximately 12 inches in length and width beside the 285-H basin wall at the construction joint tha…
Office of NEPA Policy and Compliance
March 21, 2019Proposed activity is to dig 12 inches deep by approximately 12 inches in length and width beside the 285-H basin wall at the construction joint that is leaking and complete repair.