CX-019767: Remove and Re-install Insulation on Secondary Chill Water Pump 006 at Building 785-6A

Remove and re-install insulation housing from secondary chill water pump 006 at Building 785-6A. The asbestos inspection report found insulation to…

Office of NEPA Policy and Compliance

February 19, 2019
minute read time

Remove and re-install insulation housing from secondary chill water pump 006 at Building 785-6A. The asbestos inspection report found insulation to be non-asbestos. However, the gasket material has not been tested and shall be treated as presumed asbestos containing material.