CX-019448: Winthrop Tap Modification

Categorical Exclusion Determination

Office of NEPA Policy and Compliance

January 16, 2019
Estimated Read Time   min

Bonneville Power Administration proposes to loop its existing Winthrop Tap to Twisp-Okanogan 115-kilovolt transmission line into Okanogan Public Utility District’s Twisp Substation via Okanogan Public Utility District’s rebuild of a portion of its existing Twisp-Okanogan 115-kilovolt single-circuit transmission line to a new double-circuit line.