Categorical Exclusion Determination
Office of NEPA Policy and Compliance
September 4, 2018Rip-rap will be reinstalled on the right side of the H-02 outfall entry road. The minimum height of the rip-rap will be 12 inches. On the left side of the H-02 outfall entry road, the culvert seems to be blocked by debris. Work will be done to clear the debris away. A rock check dam will be installed near the H-02 entrance in line with the entry road. Its height will be at a minimum of 12 inches and its length will extend to the eroded areas (approximately 20 feet long).