CX-018343: Vernal-Hayden 138-kilovolt Transmission Line Access Road Maintenance and Structure Replacements

Categorical Exclusion Determination

Office of NEPA Policy and Compliance

June 25, 2018
minute read time

Western Area Power Administration proposes to conduct routine access road maintenance and transmission line structure replacements intermittently between Structures 30/9 and 69/9 on the Vernal-Hayden 138-kilovolt Transmission Line.