Categorical Exclusion Determination
Office of NEPA Policy and Compliance
June 25, 2018Western Area Power Administration proposes to conduct routine access road maintenance and transmission line structure replacements intermittently between Structures 30/9 and 69/9 on the Vernal-Hayden 138-kilovolt Transmission Line.