CX-017653: Initial Engineering Design of a Post-Combustion Carbon Dioxide Capture System for Duke Energy's East Bend Station Using Membrane-Based Technology

Categorical Exclusion Determination

Office of NEPA Policy and Compliance

February 27, 2018
Estimated Read Time   min

The project team will perform initial engineering design and cost estimate of a membrane-based post-combustion carbon dioxide capture system.