Categorical Exclusion Determination
Office of NEPA Policy and Compliance
September 25, 2017Western Area Power Administration proposes to replace six wood pole H-frame structures and appurtenances on its Flatiron - Valley 115-kilovolt Transmission Line. The structures will be replaced with structures of similar design.