CX-017258: Gasification Combined Heat and Power from Coal Fines

Categorical Exclusion Determination

Office of NEPA Policy and Compliance

October 27, 2017
Estimated Read Time   min

The overall objective of this project is to complete a front-end engineering design study for a 5 megawatt electrical equivalent polygenerating unit to be located at an industrial park in Hazard, Eastern Kentucky.