Relocate the GFSI Furnace Located in the Phase III per MT-HBL-2015-00004 CX(s) Applied: B1.31, B2.1Date: 07/26/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Office of NEPA Policy and Compliance
July 26, 2016Relocate the GFSI Furnace Located in the Phase III per MT-HBL-2015-00004
CX(s) Applied: B1.31, B2.1
Date: 07/26/2016
Location(s): South Carolina
Offices(s): Savannah River Operations Office
The GFSI Furnace (C&M model number 1712BL) is no longer needed for current processing. The furnace is to be relocated (moved) to allow more efficient glovebox operations by providing additional glovebox floor and operating area space within reach of the operating side gloves.