CX-015225: Categorical Exclusion Determination

Medicine Bow Line Switch and Structure Replacement on Miracle Mile Snowy Range No. 1 115 Kilovolt Transmission Line Carbon County CX(s) Applied: B4.6Date: 04/28/2016 Location(s): WyomingOffices(s): Western Area Power Administration-Rocky Mountain Region

Office of NEPA Policy and Compliance

April 28, 2016
Estimated Read Time   min

Medicine Bow Line Switch and Structure Replacement on Miracle Mile Snowy Range No. 1 115 Kilovolt Transmission Line Carbon County
CX(s) Applied: B4.6
Date: 04/28/2016
Location(s): Wyoming
Offices(s): Western Area Power Administration-Rocky Mountain Region

Western Area Power Administration (WAPA) proposes to hire a contractor to construct and complete the medicine bow line switch and structure replacement on the transmission line.

Document(s) Available for Download