MOX Laydown Northeast of 705-A CX(s) Applied: B1.15Date: 07/06/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Office of NEPA Policy and Compliance
July 6, 2015MOX Laydown Northeast of 705-A
CX(s) Applied: B1.15
Date: 07/06/2015
Location(s): South Carolina
Offices(s): Savannah River Operations Office
MOX Services proposes to establish a laydown yard in a portion of an existing asphalt-surfaced parking lot located northeast of 705-A. A buffer of at least 10 feet will be maintained adjacent to the existing fire water and domestic water lines. The buffer will be used for equipment turnaround and material loading/unloading, but will not be used for material storage.