CX-014102: Categorical Exclusion Determination

Replace Critical Loop Transformers & Cables Damaged by Hurricane Ike CX(s) Applied: B1.3Date: 08/17/2015 Location(s): TexasOffices(s): Strategic Petroleum Reserve Field Office

Office of NEPA Policy and Compliance

August 17, 2015
Estimated Read Time   min

Replace Critical Loop Transformers & Cables Damaged by Hurricane Ike
CX(s) Applied: B1.3
Date: 08/17/2015
Location(s): Texas
Offices(s): Strategic Petroleum Reserve Field Office

Manufacturer / supplier shall provide Loop Feed Transformers 4.16 kilovolt / 480 volts in the quantities and sizes shown in Specification 16462 of the scope of work for this contract.

Document(s) Available for Download