Developing and Validating Pressure Management and Plume Control Strategies in the Williston Basin through a Brine Extraction and Storage Test CX(s) Applied: A9, B3.6, B4.6Date: 07/22/2015 Location(s): North DakotaOffices(s): National Energy Technology ...
Office of NEPA Policy and Compliance
July 22, 2015Developing and Validating Pressure Management and Plume Control Strategies in the Williston Basin through a Brine Extraction and Storage Test
CX(s) Applied: A9, B3.6, B4.6
Date: 07/22/2015
Location(s): North Dakota
Offices(s): National Energy Technology Laboratory
1) Design an extracted water desalination system; 2) validate the system performance with field-sourced water; 3) design a field pilot extracted water desalination system.