CX-014078: Categorical Exclusion Determination

Developing and Validating Pressure Management and Plume Control Strategies in the Williston Basin through a Brine Extraction and Storage Test CX(s) Applied: A9, B3.6, B4.6Date: 07/22/2015 Location(s): North DakotaOffices(s): National Energy Technology ...

Office of NEPA Policy and Compliance

July 22, 2015
Estimated Read Time   min

Developing and Validating Pressure Management and Plume Control Strategies in the Williston Basin through a Brine Extraction and Storage Test
CX(s) Applied: A9, B3.6, B4.6
Date: 07/22/2015
Location(s): North Dakota
Offices(s): National Energy Technology Laboratory

1) Design an extracted water desalination system; 2) validate the system performance with field-sourced water; 3) design a field pilot extracted water desalination system.

Document(s) Available for Download