Franklin-Badger Canyon #2 and McNary-Franklin #2 Wood Pole Replacement CX(s) Applied: B1.3Date: 04/09/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Office of NEPA Policy and Compliance
April 9, 2015Franklin-Badger Canyon #2 and McNary-Franklin #2 Wood Pole Replacement
CX(s) Applied: B1.3
Date: 04/09/2015
Location(s): Washington
Offices(s): Bonneville Power Administration
Bonneville Power Administration (BPA) proposes to replace deteriorating wood pole structures and associated structural/electrical components on the Franklin-Badger Canyon #2 and McNary-Franklin #2 transmission lines.