Next Generation Groundwater Treatment System CX(s) Applied: B1.26 Date: 09/19/2013 Location(s): Missouri Offices(s): Kansas City Site Office
Office of NEPA Policy and Compliance
September 19, 2013Next Generation Groundwater Treatment System
CX(s) Applied: B1.26
Date: 09/19/2013
Location(s): Missouri
Offices(s): Kansas City Site Office
A finalization study was conducted under Phase A of this project. The finalization study identified needed modifications to the existing Groundwater Treatment (GWTS) and the Industrial Waste Treatment Systems to implement new technologies for the new Groundwater Treatment System.
CX(s) Applied: B1.26
Date: 09/19/2013
Location(s): Missouri
Offices(s): Kansas City Site Office
A finalization study was conducted under Phase A of this project. The finalization study identified needed modifications to the existing Groundwater Treatment (GWTS) and the Industrial Waste Treatment Systems to implement new technologies for the new Groundwater Treatment System.