Subcontractor Repair of Leaks over Rooms 12, 15, Hallway at 772-25B CX(s) Applied: B1.3 Date: 08/21/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Office of NEPA Policy and Compliance
August 21, 2013Subcontractor Repair of Leaks over Rooms 12, 15, Hallway at 772-25B
CX(s) Applied: B1.3
Date: 08/21/2013
Location(s): South Carolina
Offices(s): Savannah River Operations Office
C.E. Bourne, a roofing subcontractor, will repair leaks over rooms 12, 15, hallway at 772-25B.
CX(s) Applied: B1.3
Date: 08/21/2013
Location(s): South Carolina
Offices(s): Savannah River Operations Office
C.E. Bourne, a roofing subcontractor, will repair leaks over rooms 12, 15, hallway at 772-25B.