Buildings 7-11 Sidewalk Replacement CX(s) Applied: B1.15, B2.1, B2.5 Date: 09/11/2013 Location(s): Oregon Offices(s): National Energy Technology Laboratory
Office of NEPA Policy and Compliance
September 11, 2013Buildings 7-11 Sidewalk Replacement
CX(s) Applied: B1.15, B2.1, B2.5
Date: 09/11/2013
Location(s): Oregon
Offices(s): National Energy Technology Laboratory
Replace the existing sidewalk with a code compliant/ADA compliant sidewalk.
CX(s) Applied: B1.15, B2.1, B2.5
Date: 09/11/2013
Location(s): Oregon
Offices(s): National Energy Technology Laboratory
Replace the existing sidewalk with a code compliant/ADA compliant sidewalk.