CX-010866: Categorical Exclusion Determination

Removal of Heat Exchangers and Associated Piping from Disassembly Roof CX(s) Applied: B2.5 Date: 07/01/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office

Office of NEPA Policy and Compliance

July 1, 2013
Estimated Read Time   min
Removal of Heat Exchangers and Associated Piping from Disassembly Roof
CX(s) Applied: B2.5
Date: 07/01/2013
Location(s): South Carolina
Offices(s): Savannah River Operations Office

Removal of the Disassembly Basin Cooling and Filtration system heat exchangers and associated cooling water piping and supports to eliminate potential safety hazards due to corrosion. This system has been shut down for many years and is no longer needed.