Lay up of 483-6D Surge Basin CX(s) Applied: B1.26 Date: 06/07/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Office of NEPA Policy and Compliance
June 7, 2013Lay up of 483-6D Surge Basin
CX(s) Applied: B1.26
Date: 06/07/2013
Location(s): South Carolina
Offices(s): Savannah River Operations Office
Lay up of 483-6D Back Wash Filter Surge Basin, remove sludge, fabric liner. Breach dike and direct storm water flow to southwest.
CX(s) Applied: B1.26
Date: 06/07/2013
Location(s): South Carolina
Offices(s): Savannah River Operations Office
Lay up of 483-6D Back Wash Filter Surge Basin, remove sludge, fabric liner. Breach dike and direct storm water flow to southwest.