Optimization of Pressurized Oxy-Combustion with Flameless Reactor - Phase I CX(s) Applied: B3.6 Date: 08/31/2012 Location(s): Massachusetts Offices(s): National Energy Technology Laboratory
Office of NEPA Policy and Compliance
August 31, 2012Optimization of Pressurized Oxy-Combustion with Flameless Reactor - Phase I
CX(s) Applied: B3.6
Date: 08/31/2012
Location(s): Massachusetts
Offices(s): National Energy Technology Laboratory
Procurement and assembly of the 100 kilowatt bench-scale reactor.
CX(s) Applied: B3.6
Date: 08/31/2012
Location(s): Massachusetts
Offices(s): National Energy Technology Laboratory
Procurement and assembly of the 100 kilowatt bench-scale reactor.