Pull/Install New Fiber Optic Cables From 241-2H to 241-62F (General) CX(s) Applied: B1.7 Date: 08/23/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Office of NEPA Policy and Compliance
August 23, 2012Pull/Install New Fiber Optic Cables From 241-2H to 241-62F (General)
CX(s) Applied: B1.7
Date: 08/23/2012
Location(s): South Carolina
Offices(s): Savannah River Operations Office
Install new fiber optic cables from H Tank Farm (HTF) to F Tank Farm (FTF).
CX(s) Applied: B1.7
Date: 08/23/2012
Location(s): South Carolina
Offices(s): Savannah River Operations Office
Install new fiber optic cables from H Tank Farm (HTF) to F Tank Farm (FTF).