Building 720-2A Chiller Replacement CX(s) Applied: B1.3 Date: 08/08/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Office of NEPA Policy and Compliance
August 8, 2012Building 720-2A Chiller Replacement
CX(s) Applied: B1.3
Date: 08/08/2012
Location(s): South Carolina
Offices(s): Savannah River Operations Office
Replace the chillers for the 720-2A building. This work WILL NOT require the addition a small concrete pad just outside of the building as previously thought.
CX(s) Applied: B1.3
Date: 08/08/2012
Location(s): South Carolina
Offices(s): Savannah River Operations Office
Replace the chillers for the 720-2A building. This work WILL NOT require the addition a small concrete pad just outside of the building as previously thought.