Re-supply of Electrical Loads Fed from 192-K & 183-3K CX(s) Applied: B1.3 Date: 05/16/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Office of NEPA Policy and Compliance
May 16, 2012Re-supply of Electrical Loads Fed from 192-K & 183-3K
CX(s) Applied: B1.3
Date: 05/16/2012
Location(s): South Carolina
Offices(s): Savannah River Operations Office
Install a new 13.8 kilovolt transformer bank in K-Area and run 480 volt overhead to loads needing new power supply due to shutdown of 183-3K and 192-K. This includes the high water tank, valve box heaters, water lab and re-routing a telecommunications circuit.