Structure Replacement Flaming Gorge-Vernal No.3 138 Kilovolt Transmission Line CX(s) Applied: B4.6 Date: 03/06/2012 Location(s): Utah Offices(s): Western Area Power Administration-Rocky Mountain Region
Office of NEPA Policy and Compliance
March 6, 2012Structure Replacement Flaming Gorge-Vernal No.3 138 Kilovolt Transmission Line
CX(s) Applied: B4.6
Date: 03/06/2012
Location(s): Utah
Offices(s): Western Area Power Administration-Rocky Mountain Region
Western Area Power Administration (Western) proposes to replace Structure number 25/6 on the Flaming Gorge-Vernal number 3 138 kilovolt transmission line