Add Blanks in Central Hood Exhaust (CHEX) System Ductwork Between FLT-17 and FLT-18 CX(s) Applied: B2.3 Date: 02/06/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Office of NEPA Policy and Compliance
February 6, 2012Add Blanks in Central Hood Exhaust (CHEX) System Ductwork Between FLT-17 and FLT-18
CX(s) Applied: B2.3
Date: 02/06/2012
Location(s): South Carolina
Offices(s): Savannah River Operations Office
This activity removes two 1/8 inch thick by roughly 3 feet by 2 feet stainless steel spacers from the 773-A Central Hood Exhaust (CHEX) system. These two plates and their associated gaskets are likely radioactively contaminated. This same activity- replacing spacers with blanks, was done in 2011 between banks 53 and 54.
CX(s) Applied: B2.3
Date: 02/06/2012
Location(s): South Carolina
Offices(s): Savannah River Operations Office
This activity removes two 1/8 inch thick by roughly 3 feet by 2 feet stainless steel spacers from the 773-A Central Hood Exhaust (CHEX) system. These two plates and their associated gaskets are likely radioactively contaminated. This same activity- replacing spacers with blanks, was done in 2011 between banks 53 and 54.