Construction of a Connector Road Between the Construction Administration Complex (CAC) and the Mixed Oxide Administration Complex (MAC) Parking Lots CX(s) Applied: B1.13 Date: 11/21/2011 Location(s): South Carolina Offices(s): Savannah River Operatio...
Office of NEPA Policy and Compliance
November 21, 2011CX(s) Applied: B1.13
Date: 11/21/2011
Location(s): South Carolina
Offices(s): Savannah River Operations Office
Mixed Oxide (MOX) Services proposes the construction of a road connecting the Construction Administration Complex (CAC) and the MOX Administration Complex (MAC) parking lots. The approximate dimensions of the proposed connector road are 160 feet in length and 17 feet in width, with a construction limits footprint of 0.4 acre.