Construction of 37 Parking Spaces South of 251-4F CX(s) Applied: B1.15 Date: 01/17/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Office of NEPA Policy and Compliance
January 17, 2012Construction of 37 Parking Spaces South of 251-4F
CX(s) Applied: B1.15
Date: 01/17/2012
Location(s): South Carolina
Offices(s): Savannah River Operations Office
Mixed Oxide Services proposes the construction of approximately 37 parking spaces immediately south of the existing 251-4F electrical substation. The existing asphalt will be resurfaced with approximately one inch of asphalt. The existing unenergized power pole, sign for the 251-4F substation, and bollards will be removed by cutting them flush with the existing asphalt surface prior to resurfacing.
CX(s) Applied: B1.15
Date: 01/17/2012
Location(s): South Carolina
Offices(s): Savannah River Operations Office
Mixed Oxide Services proposes the construction of approximately 37 parking spaces immediately south of the existing 251-4F electrical substation. The existing asphalt will be resurfaced with approximately one inch of asphalt. The existing unenergized power pole, sign for the 251-4F substation, and bollards will be removed by cutting them flush with the existing asphalt surface prior to resurfacing.