Cost of Energy Reduction for Offshore Tension Leg Platform (TLP) Wind Turbine Systems Through Advanced Control Strategies for Energy Yield Improvement, Load Mitigation and Stabilization CX(s) Applied: A9 Date: 01/19/2012 Location(s): Virginia Offices(...
Office of NEPA Policy and Compliance
January 19, 2012Cost of Energy Reduction for Offshore Tension Leg Platform (TLP) Wind Turbine Systems Through Advanced Control Strategies for Energy Yield Improvement, Load Mitigation and Stabilization
CX(s) Applied: A9
Date: 01/19/2012
Location(s): Virginia
Offices(s): Golden Field Office
DOE is proposing to provide federal funding to Alstom Power Incorporated (Alstom) to develop software for designing small to medium size wind turbines using computer modeling simulation and field-validation.