Record of Categorical Exclusion for Big Hill Anhydrite Pond Liner Replacement CX(s) Applied: B1.3 Date: 12/20/2011 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office
Office of NEPA Policy and Compliance
December 20, 2011Record of Categorical Exclusion for Big Hill Anhydrite Pond Liner Replacement
CX(s) Applied: B1.3
Date: 12/20/2011
Location(s): Texas
Offices(s): Strategic Petroleum Reserve Field Office
Subcontractor shall provide all labor, tools, equipment, materials, consumables, services, insurance, transportation, storage and supervision required to replace the Big Hill Anhydrite Pond Liner.