CX-006600: Categorical Exclusion Determination

Bryan Mound Site Building Upgrades, Phase IICX(s) Applied: B1.3Date: 07/12/2011Location(s): Freeport, TexasOffice(s): Strategic Petroleum Reserve Field Office

Office of NEPA Policy and Compliance

July 12, 2011
Estimated Read Time   min
Bryan Mound Site Building Upgrades, Phase II
CX(s) Applied: B1.3
Date: 07/12/2011
Location(s): Freeport, Texas
Office(s): Strategic Petroleum Reserve Field Office

Subcontractor shall provide all labor, tools, materials, equipment and supervision required to perform various building upgrades at Bryan Mound Buildings 202 and 245. Subcontractor shall evaluate and implement Green Building Design where applicable.

DOCUMENT(S) AVAILABLE FOR DOWNLOAD