CX-006373: Categorical Exclusion Determination

Connect 735-11A to the Central Plant Chilled Water SystemCX(s) Applied: B1.3Date: 06/15/2011Location(s): Aiken, South CarolinaOffice(s): Environmental Management, Savannah River Operations Office

Office of NEPA Policy and Compliance

June 15, 2011
Estimated Read Time   min
Connect 735-11A to the Central Plant Chilled Water System
CX(s) Applied: B1.3
Date: 06/15/2011
Location(s): Aiken, South Carolina
Office(s): Environmental Management, Savannah River Operations Office

Currently the 735-11A heating, ventilation and air conditioning (HVAC) unit runs off an inefficient chiller. The chiller will be abandoned in place and the HVAC unit's chilled water coils will be tied into the Central Plant Chilled Water System (CHW) System.