Indiana-City-South BendCX(s) Applied: A1, A9, A11, B2.5, B5.1Date: 07/27/2011Location(s): South Bend, IndianaOffice(s): Energy Efficiency and Renewable Energy
Office of NEPA Policy and Compliance
July 27, 2011CX(s) Applied: A1, A9, A11, B2.5, B5.1
Date: 07/27/2011
Location(s): South Bend, Indiana
Office(s): Energy Efficiency and Renewable Energy
Energy Efficiency and Conservation Block Grant Program. 1) Establish an Office of Energy; 2) energy audits of public buildings; 3) replace lighting in Martin Luther King Center, Howard Black Recreation Center, Park Maintenance Building, and Fire Station 6 and install sensors and high efficiency condensing gas ceiling units at Fire Station 6; 4) traffic signal optimization and route optimization for waste trucks; and 5) install an existing 50 kilowatt hydroelectric generator into an existing turbine chamber at the city-owned dam at the East Race Waterway and conduct feasibility study for a 1.8 megawatt hydroelectric generator.