Biomass to Gasoline and Diesel Using Integrated Hydropyrolysis Plus HydroconversionCX(s) Applied: A9, B3.6Date: 05/26/2011Location(s): IllinoisOffice(s): Energy Efficiency and Renewable Energy, Golden Field Office
Office of NEPA Policy and Compliance
May 26, 2011CX(s) Applied: A9, B3.6
Date: 05/26/2011
Location(s): Illinois
Office(s): Energy Efficiency and Renewable Energy, Golden Field Office
This review is a continuation of review GFO-270-10 to include new tasks to allow for additional project funds to be allocated for the design and operation of an integrated 50 kilogram/day. This project will test different types of feedstock. The construction of the facility is being funded by private outside source and will be located within an existing bay at the GFI Flex Fuel Test Facility/Advanced Gasification Test Fuel Facility.