Energy Efficiency Retrofits and Conservation PlanCX(s) Applied: A1, A9, B2.3, B5.1Date: 04/05/2011Location(s): Penn Hills, PennsylvaniaOffice(s): Energy Efficiency and Renewable Energy
Office of NEPA Policy and Compliance
April 5, 2011CX(s) Applied: A1, A9, B2.3, B5.1
Date: 04/05/2011
Location(s): Penn Hills, Pennsylvania
Office(s): Energy Efficiency and Renewable Energy
Energy Efficiency and Conservation Block Grant. 1) Boiler replacement with heating, ventilation, and air conditioning systems; 2) prepare energy efficiency and conservation plan; 3) lighting upgrades and insulation improvements to buildings; 4) replacing traffic signal lights.