Iberdrola USA Advanced Compressed Air Energy Storage (150 Megawatt) Demonstration PlantCX(s) Applied: A9, B3.1, B5.1Date: 11/10/2010Location(s): Binghamton, New York Office(s): Electricity Delivery and Energy Reliability, National Energy Technology Lab...
Office of NEPA Policy and Compliance
November 10, 2010CX(s) Applied: A9, B3.1, B5.1
Date: 11/10/2010
Location(s): Binghamton, New York
Office(s): Electricity Delivery and Energy Reliability, National Energy Technology Laboratory
The proposed work consists of Phase 1 only of the project - engineering design, economic analysis, and system feasibility study (including test drilling and geological evaluation of the cavern).