CX-003626: Categorical Exclusion Determination

Swapping Substation Bay Terminals of Bonneville Power Administration?s (BPA) White Bluffs-Richland Number 1 and Department of Energy B3-S4-White Bluffs Number 1 Transmission LinesCX(s) Applied: B1.3Date: 08/09/2010Location(s): Benton County, Washingto...

Office of NEPA Policy and Compliance

August 9, 2010
Estimated Read Time   min
Swapping Substation Bay Terminals of Bonneville Power Administration?s (BPA) White Bluffs-Richland Number 1 and Department of Energy B3-S4-White Bluffs Number 1 Transmission Lines
CX(s) Applied: B1.3
Date: 08/09/2010
Location(s): Benton County, Washington
Office(s): Bonneville Power Administration

Bonneville Power Administration (BPA) has a need to replace/modify wood pole structures in order to swap the substation bay terminations of BPA?s White Bluffs-Richland Number 1 and the Department of Energy (DOE) B3 S4-White Bluffs Number 1 transmission lines.