Flow Battery Solution for Smart Grid Renewable Energy Applications; American Recovery and Reinvestment Act Funding: DE-FOA-0000036CX(s) Applied: B3.6, B4.4, A1, B4.11Date: 06/03/2010Location(s): Turlock, CaliforniaOffice(s): Electricity Delivery and En...
Office of NEPA Policy and Compliance
June 3, 2010CX(s) Applied: B3.6, B4.4, A1, B4.11
Date: 06/03/2010
Location(s): Turlock, California
Office(s): Electricity Delivery and Energy Reliability, National Energy Technology Laboratory
Installation, commissioning, and operation of EnerVault's redox flow battery. Battery will be tested in conjunction with existing photovoltaic system to supply power to an existing 350 horsepower irrigation pump.