Decontamination and Destruction of Building 710-B Hazardous Waste Storage FacilityCX(s) Applied: B1.23Date: 02/23/2010Location(s): Aiken, South CarolinaOffice(s): Environmental Management, Savannah River Operations Office
Office of NEPA Policy and Compliance
February 23, 2010CX(s) Applied: B1.23
Date: 02/23/2010
Location(s): Aiken, South Carolina
Office(s): Environmental Management, Savannah River Operations Office
The proposed action is to demolish and remove Building 710-B, Hazardous Waste Storage Facility, the 8 x 40 foot metal storage container and fill the underground fuel oil tank to the west of Building 710-B with concrete/grout. The proposed decommissioning end-state for the building is demolition down to the slab, the storage container will be relocated and the underground storage tank will be filled with grout.