CX-000814: Categorical Exclusion Determination

85/30 Ton Crane UpgradeCX(s) Applied: B2.5Date: 12/16/2009Location(s): Aiken, South CarolinaOffice(s): Environmental Management, Savannah River Operations Office

Office of NEPA Policy and Compliance

December 16, 2009
Estimated Read Time   min
85/30 Ton Crane Upgrade
CX(s) Applied: B2.5
Date: 12/16/2009
Location(s): Aiken, South Carolina
Office(s): Environmental Management, Savannah River Operations Office

Modifications must be made to the L Area 85/30 ton crane because the L to H shipment of nuclear fuels will require implementation of the new criticality safety program invoked by Department of Energy Order 420.1b. An engineering study was performed and concluded that the 85/30 ton crane will not meet single failure requirements and needs to be upgraded.

DOCUMENT(S) AVAILABLE FOR DOWNLOAD