Gilt Edge Mine Wind Resource Assessment; National Renewable Energy Laboratory Tracking Number 10-009CX(s) Applied: B3.1Date: 02/10/2010Location(s): Deadwood, South DakotaOffice(s): Energy Efficiency and Renewable Energy, Golden Field Office
Office of NEPA Policy and Compliance
February 10, 2010CX(s) Applied: B3.1
Date: 02/10/2010
Location(s): Deadwood, South Dakota
Office(s): Energy Efficiency and Renewable Energy, Golden Field Office
This proposed project is a contract with the Environmental Protection Agency to install a meteorological (met) tower (60 meters high) at the Gilt Edge Superfund Site near Deadwood, South Dakota for 18 months. Data collected from the met tower anemometers, wind vanes and temperature and barometric sensors would be used for data collection, analyzing, and mainaining data.