Safeguards and Security Follow-Up Assessment at the Nevada National Security Site, July 31, 2020 (UNCI)

Results of the Office of Safeguards and Security Assessments Limited-Notice Performance Tests at the Idaho National Laboratory, Conducted January 28-30, 2020 [February 18, 2020] (OUO)

Results of the Office of Safeguards and Security Assessments Limited-Notice Performance Tests at the Paducah Gaseous Diffusion Plant, Conducted December 16-18, 2019 [January 16, 2020]

Results of the Office of Safeguards and Security Assessments Limited-Notice Performance Tests at the Hanford Site, Conducted January 7-9, 2020 [January 22, 2020] (OUO)

2019

Results of Office of Safeguards and Security Assessments Limited-Notice Performance Tests at the Nevada National Security Site, November 19-21, 2019 [December 17, 2019] (UCNI)

Office of Enterprise Assessment Safeguards and Security Assessment at the Pacific Northwest National Laboratory, December 16, 2019 (OUO)

Results of Limited-Notice Performance Tests at the Savannah River Site, Conducted October 8-10, 2019 [December 12, 2019] (OUO)

Office of Security Assessments Safeguards and Security Assessment at the Los Alamos National Laboratory, December 9, 2019

Results of Limited-Notice Performance Tests at the Department of Energy Headquarters Buildings, Conducted October 1-3, 2019 [December 5, 2019] (OUO)

Results of Limited-Notice Performance Tests at the Oak Ridge National Laboratory, Conducted September 3-5, 2019 [October 15, 2019] (OUO)

Results of Limited-Notice Performance Tests at the Sandia National Laboratories – New Mexico, Conducted July 16-18, 2019 [September 6, 2019] (OUO)

Office of Security Assessments Appraisal of the Material Control and Accountability Program at the Paducah Gaseous Diffusion Plant, August 6, 2019 (OUO)

Office of Security Assessments Safeguards and Security Assessment at the Y-12 National Security Complex, July 22, 2019 

Results of Limited-Notice Performance Tests at the Pantex Plant, Conducted June 18-20, 2019 [July 22, 2019] (UCNI)

Results of Limited-Notice Performance Tests at the Kansas City National Security Campus, Conducted June 4-6, 2019 [July 22, 2019] (OUO)

Results of Limited-Notice Performance Tests at the Strategic Petroleum Reserve, Conducted April 16-18, 2019 [June 3, 2019] (OUO)

Results of Limited-Notice Performance Tests at the Idaho National Laboratory, Conducted April 2-4. 2019 [June 3, 2019] (OUO)

Results of Limited-Notice Performance Tests at the Hanford Site, Conducted March 26-28, 2019 [April 24, 2019] (OUO)

Results of a Preliminary Review of the National Nuclear Security Administration’s Savannah River Site Tritium Facility, April 2, 2019 (UCNI)

Results of Limited-Notice Performance Tests at the Lawrence Livermore National Laboratory, Conducted February 19-21, 2019 [April 1, 2019] (UCNI)

Safeguards and Security Assessment at the Nevada National Security Site, April 1, 2019 

Results of Limited-Notice Performance Tests at the Los Alamos National Laboratory, Conducted January 15-17, 2019 [March 14, 2019] (UCNI)

Results of Limited-Notice Performance Tests at the Savanah River Site, Conducted December 6, 2018 [January 9, 2019] (UCNI)

2018

(U) Results of Limited-Notice Performance Tests at the Hanford Site, Conducted November 6-8, 2018 [December 21, 2018] (OUO)

(U) Office of Enterprise Assessments Safeguards and Security Assessment at the Princeton Plasma Physics Laboratory, November 27, 2018 (OUO)

(U) Results of Limited-Notice Performance Tests at the Y-12 National Security Complex, Conducted September 25-27, 2018 [October 18, 2018] (UCNI)

(U) Office of Enterprise Assessments Safeguards and Security Assessment at the Pantex Plant, October 9, 2018 (Classified) 

(U) Results of Limited-Notice Performance Tests at the Idaho National Laboratory, Conducted August 28-29, 2018 [September 19, 2018] (OUO)

(U) Office of Enterprise Assessments Review of the Material Control and Accountability Program at the Portsmouth Gaseous Diffusion Plant, July 16, 2018 (OUO)

(U) Office of Enterprise Assessments Limited Security Assessment at the U.S. Department of Energy Headquarters, June 27, 2018 (Confidential)

(U) Office of Enterprise Assessments Security Assessment at the Office of Secure Transportation Headquarters and Agent Operations Western Command, June 21, 2018 (Classified)

(U) Results of Limited-Notice Performance Tests at the Oak Ridge National Laboratory, Conducted May 8-9, 2018 [June 1, 2018] (OUO) 

(U) Results of Limited-Notice Performance Tests at the Los Alamos National Laboratory, Conducted April 17-19, 2018 [May 18, 2018] (UCNI)

(U) Office of Enterprise Assessments Physical and Information Security Assessment of the Brookhaven Counterintelligence Field Office Sensitive Compartmented Information Facility, April 18, 2018 (Classified) 

(U) Office of Enterprise Assessments Safeguards and Security Assessment at the Lawrence Livermore National Laboratory, March 28, 2018 (Classified)

(U) Results of Limited-Notice Performance Tests at the Pantex Plant, Conducted February 13-15, 2018 [March 14, 2018] (UCNI)

(U) Office of Enterprise Assessments Physical, Information, and Cyber Security Assessment of the Kansas City National Security Campus Field Intelligence Element Sensitive Compartmented Information Facility, February 26, 2018 (Classified)

(U) Office of Enterprise Assessments Security Assessment of the National Nuclear Security Administration Production Office - Pantex Nuclear Production Field Intelligence Element and Pantex Counterintelligence Field Office Sensitive Compartmented Information Facility, February 26, 2018 (Classified)

(U) Addendum to the Office of Enterprise Assessments Safeguards and Security Assessment at the Hanford Site, February 7, 2018 (Classified)

(U) Office of Enterprise Assessments Safeguards and Security Assessment at the Sandia National Laboratories, California, January 24, 2018 (Classified)

(U) Results of Limited-Notice Performance Tests at the Savannah River Site, Conducted November 28-29, 2017 [January 5, 2018] (UCNI)

2017

(U) Office of Enterprise Assessments Safeguards and Security Assessment at the Idaho National Laboratory, December 19, 2017 (Classified)

(U) Office of Enterprise Assessments Results of the Protective Force Focused Assessment at the Brookhaven National Laboratory, August 29-31, 2017 [October 11, 2017] (OUO)

(U) Results of Limited-Notice Performance Tests at the Pantex Plant, Conducted on August 22-23, 2017 [September 5, 2017] (UCNI)

(U) Office of Enterprise Assessments Limited-Scope Assessment of Protective Force Management and Capabilities at the West Valley Demonstration Project, August 2017 [August 11, 2017] (OUO)

(U) Office of Enterprise Assessments Safeguards and Security Assessment at the Hanford Site, August 7, 2017 (Classified)

(U) Results of Limited-Notice Performance Tests at the Office of Secure Transportation Aviation Operations Division, Conducted July 17-20, 2017 [August 2, 2017] (UCNI)

(U) Results of Limited-Notice Performance Tests at the Oak Ridge National Laboratory, Conducted July 11-12, 2017 [July 31, 2017] (OUO)

(U) Results of Limited-Notice Performance Tests at the Y-12 National Security Complex, Conducted May 23-24, 2017 [June 9, 2017] (OUO)

(U) Results of Limited-Notice Performance Tests at the Nevada National Security Site, Conducted May 16-17, 2017 [May 31, 2017] (OUO)

(U) Office of Enterprise Assessments Safeguards and Security Assessment of the Savannah River Site, May 22, 2017 (Classified)

(U) Office of Enterprise Assessments Assessment of the Material Control and Accountability Program at the Paducah Gaseous Diffusion Plant, May, 2017 [May 1, 2017] (OUO)

(U) Results of Limited-Notice Performance Tests at the Idaho National Laboratory, Conducted April 18-19, 2017 [April 28, 2017] (OUO)

(U) Results of Limited-Notice Performance Tests at the Los Alamos National Laboratory, Conducted April 4-5, 2017 [April 24, 2017] (UCNI)

(U) Results of Limited-Notice Performance Tests at the Hanford Site, Conducted January 10-11, 2017 [January 30, 2017] (OUO)

(U) Office of Enterprise Assessments Safeguards and Security Assessment at the Oak Ridge National Laboratory, January 17, 2017 (Classified)

2016

(U) Results of Limited-Notice Performance Tests at the Pantex Plant, Conducted December 6-7, 2016 [December 22, 2016] (UCNI)

(U) Office of Enterprise Assessments Security Assessment of the Y-12 National Security Complex, November 28, 2016 (Classified)

(U) Results of Limited-Notice Performance Tests at the Savannah River Site, Conducted September 26-28, 2016 [October 28, 2016] (UCNI)

(U) Office of Enterprise Assessments Security Assessment at the National Nuclear Security Administration's Albuquerque Complex, August 8, 2016 (Classified)

(U) Office of Enterprise Assessments Limited-Scope Assessment of Protective Force Management and Capabilities at the Waste Isolation Pilot Plant, July 2016 [July 14, 2016] (OUO)

(U) Office of Enterprise Assessments Focused Assessment of the Office of Secure Transportation's Issues Management Process, June 2016 [June 24, 2016] (OUO)

(U) Office of Enterprise Assessments Limited-Scope Assessment of Protective Force Management and Capabilities at the Paducah Gaseous Diffusion Plant, June 2016 [June 21, 2016] (OUO)

(U) Results of Limited-Notice Performance Tests at the Oak Ridge National Laboratory Conducted May 10-11 2016 [June 10, 2016] (OUO)

(U) Office of Enterprise Assessments Review of the Material Control and Accountability Program at the Portsmouth Gaseous Diffusion Plant, May 2016 [May 27, 2016] (OUO)

(U) Results of Limited-Notice Performance Tests at the Idaho National Laboratory Conducted April 26-27, 2016 [May 25, 2016] (OUO)

(U) Office of Enterprise Assessments Safeguards and Security Assessment at the Los Alamos National Laboratory, May 16, 2016 (Classified)

(U) Results of Limited-Notice Performance Tests at the Y-12 National Security Complex, Conducted April 12-13, 2016 [May 13, 2016] (UCNI)

(U) Results of Limited-Notice Performance Tests at Pacific Northwest National Laboratory Conducted March 29, 2016 [April 25, 2016] (OUO)

(U) Results of Limited-Notice-Performance Tests at Office of Secure Transportation Headquarters, Conducted December 15-16, 2015 [January 19, 2016] (OUO)

(U) Office of Enterprise Assessments Safeguards and Security Inspection of the Sandia National Laboratories, New Mexico, January 19, 2016 (Classified)

(U) Results of the Limited-Scope Assessment of Protective Force Management and Capabilities at the Portsmouth Gaseous Diffusion Plant [January 8, 2016] (OUO)

(U) Results of Limited-Notice Performance Tests at the Y-12 National Security Complex Conducted November 3-4, 2015 [January 5, 2016] (UCNI)

2015

(U) Office of Enterprise Assessments Safeguards and Security Inspection at the Nevada Nuclear Security Site, [December 21, 2015] (Classified)

(U) Office of Enterprise Assessments Security Inspection at the National Nuclear Security Administration’s, Office of Secure Transportation’s, Agent Operations Eastern Command, [December 7, 2015] (Classified)

Office of Enterprise Assessments Inspection of the Material Control and Accountability Program at the Paducah Gaseous Diffusion Plant, September 9-10, 2015 [November 6, 2015] (OUO)

(U) Office of Enterprise Assessments Safeguards and Security Inspection at the Pantex Plant, [October 5, 2015] (Classified)

Results of Limited-Notice Performance Tests at the Oak Ridge National Laboratory Conducted on July 21-22, 2015 [October 2, 2015] (OUO)

Office of Enterprise Assessments Security Inspection of Classified Matter Protection and Control at the Y-12 National Security Complex [September 21, 2015] (OUO)

(U) Office of Enterprise Assessments Security Review at the Kansas City Plant, [August 10, 2015] (Classified)

Results of Limited-Notice Performance Test at the Savannah River Site Conducted on August 18-19, 2015 [September 17, 2015] (UCNI)

Results of Limited-Notice Performance Tests at the Nevada National Security Site Conducted on May 19-20, 2015 [July 6, 2015] (UCNI)

Results of Limited-Notice Performance Test at the Los Alamos National Laboratory Conducted on March 3-4, 2015 [May 20, 2015] (UCNI)

Results of Limited-Notice Performance Test at the Pantex Plant Conducted on March 31-April 1, 2015 [May 20, 2015] (UCNI)

Results of Limited-Notice Performance Tests at the Hanford Site Conducted on January 27-28, 2015 [April 22, 2015] (OUO)

Office of Enterprise Assessments Security Inspection at the Strategic Petroleum Reserve, [April 6, 2015] (Confidential)

(U) Office of Enterprise Assessments Safeguards and Security Performance Testing Follow-Up Review at the Savannah River Site, [January 28, 2015] (Classified)

Results of Limited-Notice Performance Tests at the Oak Ridge National Laboratory Conducted on November 4-5, 2014 [January 13, 2015] (OUO)

(U) Office of Enterprise Assessments Safeguards and Security Inspection at the Y-12 National Security Complex, [January 9, 2015] (Classified)

2014

(U) Safeguards and Security Follow-up Review at the Savannah River Site, December 5, 2014 (Classified)

Results of Limited-Notice Performance Tests at the Pantex Plant Conducted on August 19-20, 2014, October 2014 (UCNI)

Results of Limited-Notice Performance Tests at the Nevada National Security Site Conducted on August 5-6, 2014, October 2014 (UCNI)

(U) Safeguards and Security Inspection at the Los Alamos National Laboratory, September 30, 2014 (Classified)

Review of the Material Control and Accountability Activities at the Paducah Department of Energy Reservation, October 2014 (OUO)

Results of Limited-Notice Performance Tests at the Office of Secure Transportation Eastern Command Conducted June 2-5, 2014, August 2014 (OUO)

Inspection of Classified Matter Protection and Control at the Nevada National Security Site, August 2014 (OUO)

(U) Independent Oversight Safeguards and Security Inspection of Idaho National Laboratory, July 18, 2014 (Classified)

Results of Limited-Notice Performance Tests at the Los Alamos National Laboratory Conducted on April 29-30, 2014, June 2014 (UCNI)

(U) Independent Oversight Safeguards and Security Follow-up Review of Security Operations at the Oak Ridge National Laboratory's Building 3019, May 12, 2014 (Classified)

Summary Report of Inspection Findings Following the July 28, 2012 Security Incident at the Y-12 National Security Complex, April 2014 (UCNI)

Results of Limited-Notice Performance Tests at the Savannah River Site Conducted on February 10-11, 2014, April 2014 (OUO)

Results of Limited-Notice Performance Tests at the Lawrence Livermore National Laboratory, Conducted on March 4-5, 2014, April 2014 (OUO)

Independent Oversight Technical Security Program Follow-Up Review at Los Alamos National Laboratory, March 2014 (OUO)

Independent Oversight Security Inspection of Classified Matter Protection and Control at the Hanford Site, March 2014 (OUO)

Independent Oversight Security Inspection of Classified Matter Protection and Control at Lawrence Livermore National Laboratory, February 2014 (OUO)

Results of Limited Notice Performance Tests at Idaho National Laboratory Conducted on November 13-14, 2013, February 2014 (OUO)

Safeguards and Security Special Review at Los Alamos the National Laboratory, January 14, 2014 (UCNI)

2013

(U) Independent Oversight Safeguards and Security Inspection at the Office of Secure Transportation, December 4, 2013 (Classified)

(U) Independent Oversight Safeguards and Security Inspection at the Nevada National Security Site, October 31, 2013 (Classified)

Independent Oversight Review of Material Control and Accountability at the Portsmouth Gaseous Diffusion Plant, August 2013 (OUO)

(U) Independent Oversight Safeguards and Security Progress Review at the Y-12 National Security Complex, June 14, 2013 (Classified)

(U) Independent Oversight Safeguards and Security Inspection at the Pantex Plant, June 14, 2013 (Classified)

(U) Independent Oversight Safeguards and Security Inspection at the Savannah River Site, May 17, 2013 (Classified)

(U) Independent Oversight Review of the Technical Security Program at Los Alamos National Laboratory, March 6, 2013 (Classified)

(U) Independent Oversight Safeguards and Security Inspection of the Hanford Site, January 31, 2013 (Classified)

Independent Assessment of Information Security Program Implementation Wackenhut Services, Inc – Oak Ridge, January 2013

(U) Independent Oversight Review of the Technical Security Program at Sandia National Laboratories-New Mexico, January 11, 2013 (Classified)

2012

(U) Independent Oversight Safeguards and Security Inspection at the Oak Ridge National Laboratory, December 28, 2012 (Classified)

(U) Independent Oversight Safeguards and Security Inspection of the Los Alamos National Laboratory, September 21, 2012 (Classified)

Independent Oversight Review of Information Security Protection at Argonne National Laboratory, September 2012 (OUO)

(U) Independent Oversight Safeguards and Security Inspection of the National Nuclear Security Administration’s Y-12 National Security Complex, September 2012 (Classified)

Independent Analytical Review of Force-on-Force Performance Tests, July 2012 (OUO)

Independent Oversight Review of NAP Implementation and Protection Program Management at Sandia National Laboratories, June 2012 (OUO)

(U) Independent Oversight Security Inspection of the Nevada National Security Site Protection Program Planning and Operations, April 13, 2012 (Classified)

Independent Oversight Review of the Material Control and Accountability Program at the Portsmouth Gaseous Diffusion Plant, April 2012 (OUO)

(U) Inspection of Pantex Plant Protective Force Response Capabilities for Intra-Site Convoy Operations, February 29, 2012 (Classified)

2011

(U) Inspection of Selected Office of Secure Transportation Protection Program Elements and Western Command Federal Agent Capabilities, December 30, 2011 (Classified)

Independent Oversight Review of the Security Areas at the Paducah Gaseous Diffusion Plant, December 2011 (OUO)

(U) Office of Health, Safety and Security Review of the Idaho National Laboratory Protective Force Response Capabilities, September 30, 2011 (Classified)

Analytical Review of the U.S. Department of Energy’s Category I Special Nuclear Material Protection Programs, September 2011 (UCNI)

Information Security Appraisal at the Kansas City Plant, July 2011 (OUO)

(U) Limited-Scope Zero Based Security Review of Savannah River Site H-Area Protection Programs, June 24, 2011 (Classified)

Security Review to Support the Portsmouth Gaseous Diffusion Plant Transition, June 2011 (OUO)

(U) Independent Oversight Zero Based Security Review of Hanford Site Protection Programs, May 6, 2011 (Classified)

Independent Oversight Material Control and Accountability Site Assistance Visit at the Portsmouth Gaseous Diffusion Plant, May 2011 (OUO)

Independent Oversight Material Control and Accountability Site Assistance Visit at the Paducah Gaseous Diffusion Plant, February 2011 (OUO)

(U) Independent Oversight Performance Testing at Lawrence Livermore National Laboratory, January 31, 2011 (Classified)

2010

(U) Independent Oversight Management Summary Report of the Zero Based Security Review/Graded Security Policy Assistance Visits at the Pantex Plant, November 19, 2010 (Classified)

(U) Independent Oversight Management Summary Assessment of Protective Force at the Y-12 National Security Complex, November 19, 2010 (Classified)

(U) Independent Oversight Management Summary Report of the Zero Based Security Review/Graded Security Protection Program Modifications at the Los Alamos National Laboratory, October 22, 2010 (Classified)

(U) Independent Oversight Special Review of the Incidents of Security Concern and Lock and Key Programs at the Y-12 National Security Complex, October 1, 2010 (Classified)

Independent Oversight Review of the Material Control and Accountability Program at the Los Alamos National Laboratory, October 2010 (UCNI)

(U) Independent Oversight Safeguards and Security Inspection of the Pantex Plant, September 17, 2010 (Classified)

Independent Oversight Management Summary Report of the Safeguards and Security Site Assistance Visit at Hanford, September 2010 (OUO)

(U) Independent Oversight Management Summary Report of the Zero Based Security Review/Graded Security Protection Assistance Visits and Proposed Protection Program Modifications at the Nevada Test Site, April 22, 2010 (Classified)

2009

(U) Independent Oversight Special Follow-up Review of Safeguards and Security Programs at the Idaho Operations Office and Idaho National Laboratory, November 30, 2009 (Classified).

Independent Oversight Special Review of Material Control and Accountability Programs at Selected DOE Category III and IV Sites, November 2009 (OUO)

Independent Oversight Review of the National Nuclear Security Administration Personnel Security Program, September 2009 (OUO)

(U) Independent Oversight Inspection of the Office of Secure Transportation, August 14, 2009 (Classified)

(U) Independent Oversight Special Follow-up of Security Programs at the Livermore Site Office and the Lawrence Livermore National Laboratory, June 12, 2009 (Classified)

(U) Independent Oversight Inspection of Classification and Information Control Programs at the Office of Science Chicago Office, Argonne Site Office, and Argonne National Laboratory, June 2009 (Classified)

(U) Independent Oversight Inspection of Classification and Information Control Programs at the Office of Science Brookhaven Site Office and Brookhaven National Laboratory, June 2009 (Classified)

(U) Independent Oversight Inspection of Classification and Information Control Programs at the Office of Science Pacific Northwest Site Office and Pacific Northwest National Laboratory, June 2009 (Classified)

(U) Independent Oversight Safeguards and Security Inspection of the Savannah River Operations Office, Savannah River Site Office, and the Savannah River Site, April 9, 2009 (Classified)

(U) Independent Oversight Safeguards and Security Inspection of the Y-12 Site Office and the Y-12 National Security Complex, January 14, 2009 (Classified)

2008

(U) Independent Oversight Safeguards and Security Inspection of the Los Alamos Site Office and the Los Alamos National Laboratory, November 17, 2008 (Classified)

(U) Independent Oversight Security Inspection of the United States Department of Energy Headquarters, July 30, 2008 (Classified)

(U) Independent Oversight Safeguards and Security Inspection of the Livermore Site Office and the Lawrence Livermore National Laboratory, June 26, 2008 (Classified)

(U) Independent Oversight Inspection of Safeguards and Security at the Pantex Plant, April 2008 (Classified)

(U) Independent Oversight Special Follow-up Review of Security and Cyber Security Programs at Los Alamos National Laboratory, February 2008 (Classified)

(U) Independent Oversight Inspection of Safeguards and Security at the Nevada Site Office and the Nevada Test Site, January 2008 (Classified)

2007

(U) Independent Oversight Inspection of Safeguards and Security at the Idaho Operations Office and the Idaho National Laboratory, November 2007 (Classified)

(U) Independent Oversight Special Review of the Technical Surveillance Countermeasures Program, October 2007 (Classified)

(U) Technical Review of The Department of Energy Graded Safeguards Table, August, 2007 (Classified)

(U) Independent Oversight Inspection of Safeguards and Security at the Sandia Site Office and the Sandia National Laboratories, August 2007 (Classified)

Independent Oversight Inspection of Classification and Information Control Programs at the Kansas City Site Office and Kansas City Plant, August 2007

(U) Independent Oversight Inspection of Safeguards and Security at the Richland Operations Office and the Hanford Site, June 2007 (Classified)

(U) Independent Oversight Inspection of Classification and Information Control Programs at the Oak Ridge Office, Oak Ridge National Laboratory, East Tennessee Technology Park, and United States Enrichment Corporation American Centrifuge Technology Program, May 2007

(U) Independent Oversight Special Review Follow-up of the National Nuclear Security Administration Service Center Personnel Security Clearance Program, April 2007 (Classified)(U) Independent Oversight

Inspection of Security at the Strategic Petroleum Reserve, April 2007 (Classified)

(U) Independent Oversight Inspection of Safeguards and Security at the Los Alamos Site Office and Los Alamos National Laboratory, February 2007 (Classified)

2006

(U) Independent Oversight Inspection of Classification and Information Control Programs at the Richland Operations Office, Office of River Protection, and Project Hanford Management Contract, November 2006 (Classified)

(U) Independent Oversight Inspection of Classification and Information Control Programs at the Office of Science Pacific Northwest Site Office and Pacific Northwest National Laboratory, November 2006 (Classified)

(U) Independent Oversight Inspection of Classification and Information Control Programs at the Chicago Office and Argonne National Laboratory, September 2006 (Classified)

(U) Independent Oversight Inspection of Safeguards and Security at the Savannah River Site, August 8, 2006 (Classified)

Independent Oversight Inspection of Classified Cyber Security and Classified Matter Protection and Control at the Office of Scientific and Technical Information, June 2006 (OUO)

(U) Independent Oversight Safeguards and Security Inspection of the Pantex Plant and the Pantex Site Office, May 16, 2006 (Classified)

(U) Independent Oversight Inspection of Safeguards and Security at the Oak Ridge National Laboratory, April 19, 2006 (Classified)

(U) Independent Oversight Security Inspection of the Kansas City Site Office and the Kansas City Plant, February 23, 2006 (Classified)

(U) Independent Oversight Security Inspection of the Office of Secure Transportation, January 17, 2006 (Classified)

2005

Independent Oversight Special Review of the Security of Classified Parts Shipped to the Waste Isolation Pilot Plant, December 2005 (OUO)

(U) Independent Oversight Special Review of the National Nuclear Security Administration Service Center Personnel Security Clearance Program, October 26, 2005, (Classified)

(U) Safeguards and Security Inspection of the Nevada Site Office and Nevada Test Site, October 11, 2005, (Classified)

(U) Independent Oversight Safeguards and Security Inspection of Y-12, Volume I, Security, July 2005 (Classified)

(U) Independent Oversight Safeguards and Security Inspection of the Sandia Site Office and Sandia National Laboratory, Volume I, Security, May 2005 (Classified)

2004

(U) Independent Oversight Safeguards and Security and Emergency Management Inspection of the Nevada Test Site, Summary Report, September 2004 (Classified)

(U) Independent Oversight Safeguards and Security Inspection of the Nevada Test Site, September 2004 (Classified)

(U) Independent Oversight Special Review of Protective Force Management and Capabilities, June 2004 (Classified)

(U) Independent Oversight Special Review of Lock and Key Programs, June 2004 (Classified)

Independent Oversight Special Review of Incidents, Inquiries, and Infractions Program at DOE Field Elements, June 2004 (OUO)

(U) Independent Oversight Safeguards and Security and Cyber Security Inspection of the Y-12 Site Office and Y-12 National Security Complex, January 2004 (Classified)

2003

(U) Independent Oversight Safeguards and Security Inspection of the Sandia Site Office and the Sandia National Laboratories, November 2003 (Classified)

Independent Oversight Safeguards and Security Inspection of the Pacific Northwest National Laboratory, July 2003 (OUO)

(U) Independent Oversight Safeguards and Security Inspection of the Hanford Site, July 2003 (Classified)

Independent Oversight Safeguards and Security Inspection of the Chicago Operations Office and the Argonne National Laboratory-East, April 2003 (OUO)

(U) Independent Oversight Inspection of Safeguards and Security of the Savannah River Site, April 2003 (Classified)

(U) Independent Oversight Inspection of Safeguards and Security of the Los Alamos Site Office and Los Alamos National Laboratory, February 2003 (Classified)

2002

(U) Independent Oversight Safeguards and Security Inspection of the Chicago Operations Office and Argonne National Laboratory-West, December 10, 2002 (Classified)

(U) Independent Oversight Security Inspection of the Office of Transportation Safeguards, October 25, 2002 (Classified)

(U) Independent Oversight Security Inspection of the Albuquerque Operations Office, October 25, 2002 (Classified)

(U) Independent Oversight Safeguards and Security Inspection of the Rocky Flats Field Office and the Rocky Flats Environmental Technology Site, July 22, 2002 (Classified)

(U) Office of Independent Oversight and Performance Assurance Special Review of the Department of Energy Personnel Security Adjudication Process, June 2002 (Classified)

(U) Independent Oversight Safeguards and Security Inspection of the Office of Amarillo Site Operations and the Pantex Plant, May 28, 2002 (Classified)

(U) Independent Oversight Safeguards and Security Inspection of the Oakland Operations Office and the Lawrence Livermore National Laboratory, April 12, 2002 (Classified)

(U) Independent Oversight Inspection of Security and Cyber Security at the Kansas City Plant, February 15, 2002 (Classified)

(U) Independent Oversight Inspection of Security at U.S. Department of Energy Headquarters, January 24, 2002 (Classified)

2001

(U) Independent Oversight Inspection of Safeguards and Security at the Y-12 National Security Complex, November 28, 2001 (Classified)

(U) Safeguards and Security Follow-up Inspection of the Argonne National Laboratory-West, June 19, 2001 (Classified)

(U) Independent Oversight Inspection of Safeguards and Security at the Hanford Site, September 5, 2001 (Classified)

(U) Independent Oversight Inspection of Safeguards and Security at the Pacific Northwest National Laboratory, September 5, 2001 (Classified)

(U) Comprehensive Inspections of the Strategic Petroleum Reserve, May 7, 2001 (Classified)

(U) Independent Safeguards and Security Inspection of the Office of Transportation Safeguards, April 6, 2001 (Classified)

(U) Independent Safeguards and Security Inspection of the Savannah River Site, March 9, 2001 (Classified)

2000

Office of Independent Oversight and Performance Assurance Information Security Review of the Department of Energy's National Emergency Response Assets, December 1, 2000 (UCNI)

(U) Follow-up Special Study of Nuclear Material Control and Accountability Programs Across the Department of Energy - Volume I: Summary Discussion and Conclusions, November 2000 (Classified)

Follow-up Special Study of Nuclear Material Control and Accountability Programs Across the Department of Energy - Volume II: Technical Discussion and Recommendations, November 2000 (OUO)

(U) Office of Independent Oversight and Performance Assurance Special Review of Security Measures at TA-18, Los Alamos National Laboratory, October 31, 2000 (Classified)

(U) Safeguards and Security Follow-up Inspection of Sandia National Laboratories, October 18, 2000 (Classified)

(U) Independent Safeguards and Security Inspection of Department of Energy Headquarters, September 29, 2000 (Classified)

(U) Independent Safeguards and Security Follow-up Inspection of the Lawrence Livermore National Laboratory, September 29, 2000 (Classified)

(U) Independent Safeguards and Security Inspection of the Oak Ridge National Laboratory, July 28, 2000 (Classified)

(U) Independent Safeguards and Security Inspection of the Idaho National Engineering and Environmental Laboratory, June 23, 2000 (Classified)

(U) Independent Safeguards and Security Inspection of the Argonne National Laboratory-West, June 23, 2000 (Classified)

(U) A Report to the Secretary of Energy on the Control of Classified Weapons Data at the National Weapons Laboratories, June 2000 (Classified)

(U) Independent Safeguards and Security Program Review of the Nevada Operations Office and the Nevada Test Site, May 18, 2000 (Classified)

(U) Independent Safeguards and Security Follow-up Inspection of the Rocky Flats Environmental Technology Site, May 15, 2000 (Classified)

(U) Independent Safeguards and Security Inspection of the Pantex Plant, April 17, 2000 (Classified)

(U) Independent Safeguards and Security Follow-up Inspection of Sandia National Laboratories/New Mexico, January 14, 2000 (Classified)

(U) Independent Safeguards and Security Follow-up Inspection of Los Alamos National Laboratory, January 14, 2000 (Classified)

(U) Independent Safeguards and Security Follow-up Inspection of the Lawrence Livermore National Laboratory, January 14, 2000 (Classified)

(U) Independent Safeguards and Security Follow-up Inspection of Sandia National Laboratories/California, January 14, 2000 (Classified)

(U) Independent Safeguards and Security Follow-up Inspection of the Transportation Safeguards Division, January 14, 2000 (Classified)