More Resources

  • March 11, 2026
    Fermi Research Alliance LLC’s Costs Incurred and Claimed for Fiscal Years 2021 and 2022 Under Contract No. DE-AC02-07CH11359
    Office of Inspector General
  • March 11, 2026
    The Tribe will install a microgrid that integrates 290 kW of new solar PV capacity together with 140 kW/560 kWh of new battery storage capacity to displace grid-delivered power and maintain resilient energy service.
    Office of Indian Energy Policy and Programs
  • March 11, 2026
    Oglala Sioux (Lakota) Housing (OSLH) will install solar photovoltaic (PV) systems to support six tribal facilities on the Pine Ridge Reservation for a total installed capacity of 54.5 kilowatts (kW).
    Office of Indian Energy Policy and Programs
  • March 11, 2026
    The Native Village of Tyonek (NVT) will install multiple energy efficiency measures on two buildings: the Tyonek Native Corporation Satellite Office and the Tribal Center.
    Office of Indian Energy Policy and Programs
  • March 11, 2026
    The goal of the project is to improve the resilience of the non-grid-connected electrical generation system at GCW to withstand short-term disruptions and rising energy costs.
    Office of Indian Energy Policy and Programs
  • March 11, 2026
    Blackfeet Community College will install approximately 53 kilowatts of solar photovoltaic systems on four buildings on the BCC campus.
    Office of Indian Energy Policy and Programs
  • March 11, 2026
    The Tribe will install 19 grid-tied, net-metered rooftop solar electric systems on owner-occupied, single-family homes of low-income families on the Bishop Paiute Reservation.
    Office of Indian Energy Policy and Programs
  • March 11, 2026
    The Village of Chefornak, along with its community utility, Naterkaq Light Plant, will purchase, install, and integrate a 500-kilowatt (kW)/677-kilowatt-hour (kWh) battery energy storage system into its standalone community wind-diesel grid.
    Office of Indian Energy Policy and Programs
  • March 11, 2026
    The Aniak Energy Efficiency Retrofit Project will install energy efficiency measures on four essential multiuse buildings in the Native Village of Aniak.
    Office of Indian Energy Policy and Programs
  • March 10, 2026
    The Ute Mountain Ute Tribe (UMUT) White Mesa Solar Initiative aims to reduce the Tribe’s dependence on outside energy sources to support UMUT tribal sovereignty and realize cost savings through tribally owned solar energy systems.
    Office of Indian Energy Policy and Programs