More Resources
-
July 7, 2026Large items designated and approved as scrap metal for the Salvage Yard will be cut down to ensure they fit into 30-yard roll-off pans. These pans …Office of NEPA Policy and Compliance
-
July 7, 2026Patching and painting holes in Building 704-N, rooms No. 72 and No. 18. …Office of NEPA Policy and Compliance
-
DocumentJuly 7, 2026Replace the North personnel door and frame at 713-2N. Repair wall and ceiling insulation at 713-2N warehouse.…Office of NEPA Policy and Compliance
-
DocumentJuly 7, 2026Repair the awning at 714-2N.…Office of NEPA Policy and Compliance
-
July 7, 2026Pole K1225 needs to be replaced, and pole 37 needs repairs. Note: This EEC is a revision of OBU-K-2024-00001 to update the prefix and extend out th…Office of NEPA Policy and Compliance
-
July 7, 2026The EEC evaluates the chemical cleaning process to remove the scale deposits from the 242-16H (2H) evaporator pot using nitric acid and in-pot neut…Office of NEPA Policy and Compliance
-
July 7, 2026Establish Interim Staging Area at 512-S to facilitate Salt Waste Processing Facility (SWPF) equipment maintenance and repair (e.g. contactors, pump…Office of NEPA Policy and Compliance
-
DocumentJuly 7, 2026This project will evaluate various adsorbents and distillation as a means to separate He-3 and He-4.…Office of NEPA Policy and Compliance
-
July 7, 2026The addition of a new electrical circuit will provide the necessary electrical capacity for the upgraded chiller unit. This modification ensures th…Office of NEPA Policy and Compliance
-
DocumentJuly 7, 2026Install WiFi at 707-10B.…Office of NEPA Policy and Compliance