July 20, 2026Identify the junction box feeds to cubicles in the center section of building 704-74F. Remove all receptacle wiring from the cubicles in the center…Office of NEPA Policy and Compliance
-
July 20, 2026This activity will remove the eleven light poles from the E-Area Parking Lot and install four new LED flood lights to existing power poles located …Office of NEPA Policy and Compliance
-
DocumentJuly 20, 2026Process Water Well 905-88H needs modifications to be set to Out of Commission status. This will consist of air gapping from the main water system a…Office of NEPA Policy and Compliance
-
DocumentJuly 20, 2026A Subcontractor will repair the roof of 709-7G. The Subcontractor "will not" disturb the existing roof while performing these repairs on 709-7G.…Office of NEPA Policy and Compliance
-
July 20, 2026This scope of work includes building steps to enter Building 713-6N.…Office of NEPA Policy and Compliance
-
July 20, 2026Restripe the yellow safety lines at the 713-2N/713-3N warehouse.…Office of NEPA Policy and Compliance
-
DocumentJuly 20, 2026Install electrical service and dishwasher at 766-H cafeteria.…Office of NEPA Policy and Compliance
-
July 19, 2026Venture Global Plaquemines LNG, LLC - FE Dkt. No. 16-28-LNGHydrocarbons and Geothermal Energy Office
-
July 19, 2026Hydrocarbons and Geothermal Energy Office