More Resources
-
July 22, 2026Install/relocate new fire extinguisher hanger brackets in 221-H.…Office of NEPA Policy and Compliance
-
July 22, 2026This activity details the general operation of polymer additive manufacturing (AM) equipment (aka, 3D printers) at the AMC (935-W, Labs 136, 137, 1…Office of NEPA Policy and Compliance
-
July 22, 2026The current capacity of 607-7B Sanitary Lift station is undersized based on existing personnel loading in building 730-2B and 730-4B. The 607-7B sa…Office of NEPA Policy and Compliance
-
July 22, 2026Construction to remove old carpet and cove base. Paint the exterior walls and any other walls/office areas identified in 730-1B, 2nd Floor. Revisio…Office of NEPA Policy and Compliance
-
July 22, 2026Planned maintenance activities at the 285-H Facility include patching leaks within and surrounding the 285-H Basin, inspecting steel channels withi…Office of NEPA Policy and Compliance
-
July 22, 2026Install electrical and build entry steps at 725-4N (Paint Storage Building).…Office of NEPA Policy and Compliance
-
July 22, 2026Installation of new plant air line and hose reel at 717-10N.…Office of NEPA Policy and Compliance
-
July 22, 2026Prep and Paint 623-29G Communications Tower.…Office of NEPA Policy and Compliance
-
July 22, 2026Prep and paint the 623-29G Communications tower.…Office of NEPA Policy and Compliance
-
Press ReleaseJuly 21, 2026Secretary Wright issued an emergency order to stabilize the grid to mitigate the risk of blackouts during hot weather conditionsEnergy.gov