More Resources
-
July 22, 2026WAPA proposes to acquire temporary access rights from willing private landowners for three areas and temporary access permissions from the U.S. Bur…Office of NEPA Policy and Compliance
-
July 22, 2026Although a prior categorical exclusion (CX-028370) addressed acquisition of land, substation assets, and an access road easement for the Cottonwood…Office of NEPA Policy and Compliance
-
July 22, 2026Sub-recipient proposes to enhance the reliability and resilience of its electrical grid by deploying 14 new SEL-651R re-closers equipped with SCADA…Office of NEPA Policy and Compliance
-
July 22, 2026he MRL is used for the synthesis and production of materials in support of Oil and Gas, Coal, and Critical Minerals Centers of Excellence research.…Office of NEPA Policy and Compliance
-
July 22, 2026Pick-up, transport and install new double-wide trailers in E-Area. Additional scope added to install sidewalks for trailers and construct a new gra…Office of NEPA Policy and Compliance
-
July 22, 2026Install a new circuit from Panel B at 705-N including a light switch and nine outdoor LED lights. Also, install an additional receptacle in the rig…Office of NEPA Policy and Compliance
-
July 22, 2026Battery chargers will be replaced in the K-Materials Storage Area, essentially like-for-like replacement.…Office of NEPA Policy and Compliance
-
July 22, 2026Perform a functionality assessment of Corridor 2 access hatch, K-Reactor.…Office of NEPA Policy and Compliance
-
July 22, 2026Perform interior and exterior renovations on trailers 704-24G, 704-25G, 704-30G and 704-41G.…Office of NEPA Policy and Compliance
-
July 22, 2026The 216-B sump pump has failed and a new one is needed at 105-L facility. In addition to installing a new pump, the existing sump needs to be clean…Office of NEPA Policy and Compliance